Day 1: The Bathroom Disaster
Day 2: The Cleanup
Day 2.5: Kitchen Shopping
Day 3: Kitchen Removal
Day 4: Plumbing and Framing
Day 5: Furnace and Sheetrock
Day 6: Door Frame and Pipe Moved
Day 7: Electrical and Flooring
Day 8: Electrical, Drywall, and Boiler Room Complete
Day 9: The Finished Product!
You must be logged in to post a comment.