Skip to content
 

Construction Day 8: Electrical, Drywall, Boiler Room Complete



Day 8 – Drywall everything in prep for kitchen install, and finish the flooring

Bathroom is once again enclosed in walls.

This view shows the outline of the difference in bathroom size.

Electrical work gets connected to panel below.

Here is the completed boiler and furnace

The bathroom fixture comes in a fancy box.


Leave a Reply

You must be logged in to post a comment.