Day 6 – Electric and plumbing infrastructure almost done





You can see here 2 new changes… fully run electrical lines and the new door
frame…




Close-up of the door frame…

Old electrical panel before it gets replaced.. with new wiring…

Organized pipes and sprinkler above heating units..


The big pipe is now moved up into the ceiling to remove the soffet…




Electric is run above the laundry…

Cat 5 is ready to be run along the trim…

Bathroom ceiling is framed and fan is installed…




Pipes still need to be prepared for sink and toilet…

Extra pictures of radiator connections…