Skip to content
 

Construction Day 3: Kitchen Removal



Day 3 – Lets break the kitchen – you know – now that we dont have a bathroom,
why stop there??

New addition for the day is the concrete that has been layed and oh by the
way we moved the toilet and added a drain in the boiler room.

So this is where the kitchen used to be…

The sofet that was removed above the kitchen cabinets to make room for the
next kitchen…

Here is where the kitchen used to be…


And here is the new boiler ready for installation

The kitche is now in the living room and in the master bedroom..

The master bedroom in its glory minus the carpet…

There actually used to be a hallway in the master bedroom that made the downstairs
into 2 studio apts.


This is what the bedroom I actually stay in looks like…


Leave a Reply

You must be logged in to post a comment.